KUWAIT CITY, March 4: The State Audit Bureau (SAB) accepted on Feb 20, 2025 the contract of the Public Authority for Roads and Transportation (PART) for the detailed design research and preparation of railway tender paperwork (first section) at a price of KD 2.426 million for three hundred and sixty five days. Sources mentioned SAB acknowledged within the approval letter that “there ought to be no delay within the venture implementation”, indicating the approval interval is 90 days most.
Sources added SAB additionally stipulated that the amended monetary provide for the tender dated Feb 13, 2025 ought to be an integral a part of the contract paperwork, together with the prices of fundamental and non-obligatory providers. It’s price mentioning that the primary section of the venture is the reference to the Gulf, the trail of which extends from the southern border with the Kingdom of Saudi Arabia (Nuwaiseeb) to the passenger station in Kuwait Metropolis, behind Kuwait Worldwide Airport on the Seventh Ring Highway and extends North by means of the Silk Metropolis to Mubarak Al-Kabeer Port. This section contains 111 kilometers of the Gulf Cooperation Council (GCC) route in Kuwait, along with 154 kilometers to achieve Mubarak Al-Kabeer Port.
When Ghanmad Ghanmam Al-Systyah/ Arab Stiff Stuff